{"id":101542,"date":"2024-05-22T10:12:12","date_gmt":"2024-05-22T08:12:12","guid":{"rendered":"https:\/\/www.els-industries.com\/?post_type=post&#038;p=101542"},"modified":"2026-06-09T12:08:54","modified_gmt":"2026-06-09T10:08:54","slug":"actualizacion-de-fabricacion-en","status":"publish","type":"post","link":"https:\/\/els.t1.vwsrvr.com.es\/en\/news\/actualizacion-de-fabricacion-en\/","title":{"rendered":"MANUFACTURING UPDATE!"},"content":{"rendered":"<p>A few weeks ago we shared that we were working on an incredible project for 26 aviation refueling units. At that time, the status of the project\u00a0was in the welding fase.<\/p>\n<p>We have completed the assembly of the module and are close to starting the assembly of the module and tank on the truck.<\/p>\n<p>&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/els.t1.vwsrvr.com.es\/wp-content\/uploads\/2016\/04\/Actualizacion-proyecto-Singapur-AVIATION-Web-1-scaled-1.jpg\" alt=\"\" width=\"2560\" height=\"1422\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/els.t1.vwsrvr.com.es\/wp-content\/uploads\/2016\/04\/Actualizacion-proyecto-Singapur-AVIATION-Web-2-scaled-1.jpg\" alt=\"\" width=\"2560\" height=\"1422\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A few weeks ago we shared that we were working on an incredible project for 26 aviation refueling units. At that time, the status of the project\u00a0was in the welding fase. We have completed the assembly of the module and are close to starting the assembly of the module and tank on the truck. &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":1545,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[916,677,742,621,1029,981,864,793,884,768,849,852,700,1015,656,785,922,861,1017,1040,302,650],"class_list":["post-101542","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-els","tag-advancedtechnology","tag-aircraftrefueller","tag-airport","tag-automotivedesign","tag-aviation","tag-bodies","tag-bodybuilder","tag-bodybuilders","tag-bodywork","tag-builttoperfom","tag-builttoperform","tag-defensa","tag-engineering","tag-export","tag-flexibility","tag-innovation","tag-maintenance","tag-military","tag-mobileworkshop","tag-refueller","tag-transportation","tag-worldwide"],"_links":{"self":[{"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/posts\/101542","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/comments?post=101542"}],"version-history":[{"count":1,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/posts\/101542\/revisions"}],"predecessor-version":[{"id":102608,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/posts\/101542\/revisions\/102608"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/media\/1545"}],"wp:attachment":[{"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/media?parent=101542"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/categories?post=101542"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/els.t1.vwsrvr.com.es\/en\/wp-json\/wp\/v2\/tags?post=101542"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}